
تعدادصفحه 8
Parking Structure Foundation Pour Schedule Dec 10
The second major concrete foundation pour for the multilevel parking structure on the Santa Rosa Campus is scheduled for this
Saturday, December 10 from 7 AM to 7 PM. The same protocols and access restrictions are in place as they were last week to
ensure a successful activity.
It is still advisable, unless you have classes or business on the Santa Rosa Campus, to avoid accessing the college from
Mendocino Avenue, especially between Elliott Avenue and Ridgeway. We still anticipate considerable congestion between
Steele Lane and College during the construction hours, though it was managed very well last week.
Contractors, engineers, and college staff alike are very pleased with the significant and positive interest in this particular
project, and find that there’s a very active interest in the excavation work and foundation pours. The safest place to view
برچسب های مهم